Down comes the old kitchen ceiling..
And while that is going on..
The cellar floor arrives..
Nine cubic yards of it pour through the door..
It gets raked flat and allowed to cure..
Much nicer.. and level too! Next to happen here is a cleaning and painting of the walls, and a rewiring.. With a new flat floor to push off of, jacking posts and a couple of walls will be built. That work should level the floors above to the point that flooring can be completed, and in the future, a finished ceiling in the basement.
Back upstairs, walls in the kitchen area are being built and the new lighting wired.. Plenty of plug outlets too..
A new smaller refrigerator arrives tomorrow. The smaller size will allow another short wall to be built in the kitchen area, and the new lower ceiling installed. After that, the floor and counter tops will be finished.
More later....